Monday, January 16, 2006

Marbella Update 1/16/06

1/16/06 The central vacuum was being put in today. The water in the bath tubs and shower stalls have drained.
1/14/06 The steps from the single car garage into the house was put in. There is a huge landing which is suppossed to be according to code. The broken step in the staircase to the basement has been fixed. Young Jeff told us that he would reframe the 'headboard' in rear boy's room. We cleaned up a bit, picking up worker's debris and construction debris. It was a family effort and the kids did a great job! Checked out a Marbella in Hensley Ct. (brown/tile roof) and looks like they may close by next month. Missing appliances, carpet and landscaping. Lot 73 has stalled and looks like we are on the same schedule or it is a little behind. Workers are putting in installation in the homes next to Lot 73. There has been a shortage of insulation and a few homes have been left idle due to this.
1/11/06 The low voltage crew were in to install the security system, phone lines, cable and surround sound. Looks like the high voltage crew came in to do some little stuff on 1/12. Still missing, the outlet in the middle of the family room (for lamp). All the tubs have water in them, looks like this was done by the inspector. Windows in the Master bath were in, including the last Sunroom window. There is one broken window in the Master bath, and more in the garage, not sure why there are extras.