Tuesday, December 06, 2005

HVAC 12/6/05


12/06/05 Installed grey fabric on roof to prep for composition roof shingles. Installation of duct work for heating/ventilation continues. Met Jeff our project manager today and voiced my communication concerns. The kitchen window was finally covered with sheathing.
12/05/05 Started the HVAC upstairs. Lalo the window installer came back to put sheathing around the windows with arches and the grey paper. 1 Family room window, 2 master bathroom windows, front door arch, 1 in rear boys room are still missing. I asked Lalo to take a look at the bend window frame in the sunroom which he fixed.
12/03/05 Installed fireplace in family room. Noticed a broken window in the family room and broken stair landing (to second level).
12/2/05 Completely finished roof sheathing. Windows incomplete.
12/1/05 Met Lalo, the window installer. He said he needs to get all windows installed to get paid tomorrow, Friday. At the end of the day, all sunroom windows were installed.
11/30/05 Sheathing completed. More windows were put up. The kitchen window was finally framed.